• -20%

Double Zero Moroso Stool

0QO MOROSO
€2,000.80
€1,600.64 Save 20%
VAT included

Double Zero Moroso Stool,design David Adjaye, with black or gold chrome-plated steel frame, upholstered seat and backrest covered in fabric or leather.

material samples moroso

Modello e dimensioni
Finitura struttura
Finitura rivestimento

CONTACT US, WE WILL OFFER YOU THE BEST PRICE

Ask for the best price!

Product customization

Don't forget to save your customization to be able to add to cart
  • 250 char. max
Pagamenti sicuri al 100%.Pagamenti sicuri al 100%.
Paga in 3 rate

Double Zero Moroso Stool

Design David Adjaye

The Moroso Double Zero stool is the creation of David Adjaye's design. A design characterised by two circles, two elementary modules inserted in a constructive geometry of Art Deco inspiration, it openly communicates the tendency towards maximum formal simplification. It is the prelude to an industrial production of the highest quality, an elegant economy of volumes expressed by the possibility, offered by the chrome-plated tubular steel structure, of declining the design into a complete seating family. Thus a chair and a stool are born, with and without armrests, a refined formal evolution dictated by class and good taste. It is a return to order, a transition towards a language that is both luxurious and synthetic.

DOUBLE ZERO MOROSO STOOL STRUCTURE:

Double Zero is made with a black or gold chrome-plated steel frame, with seat and backrest in plywood covered with fire-retardant polyurethane foam, upholstered with:

  • Divina fabric 3
  • Divina melange 3 fabric
  • Divina MD fabric
  • T-category leather
  • Leather category Z Ciré, Ciré Soft, Cervo, Cass


Cover not removable.

DOUBLE ZERO MOROSO STOOL DIMENSIONS:

The Double Zero stool is available in two sizes:
misure sgabello basso moroso double zero

misure sgabello alto moroso double zero

DOUBLE ZERO MOROSO STOOL STRUCTURE FINISHES:

finiture moroso double zero

DELIVERY TIMES DOUBLE ZERO STOOL MOROSO:

Estimated time for production and delivery of the product 6/7 working weeks from the payment received.
In this period, deliveries by manufacturing companies may be delayed.

0QO