• -25%

Shanghai Cantori Sideboard

1960.76 CANTORI LETTI
€6,840.00
€5,130.00 Save 25%
VAT included

Shanghai Cantori Sideboard wooden structure, base made of metal. 2 versions available.

campionario rivestimenti

Finitura piano
Modello e dimensioni
Finitura struttura
Finitura interno
Finitura gambe

CONTACT US, WE WILL OFFER YOU THE BEST PRICE

Ask for the best price!
Pagamenti sicuri al 100%.Pagamenti sicuri al 100%.
Paga in 3 rate

Shanghai Cantori Sideboard

Refined design, the main feature of the Shanghai Cantori sideboard. The legs are made of metal, the structure in wood and the top in wood, ceramic, marble and stone. There are 2 versions of different sizes suitable to satisfy specific furnishing requests. Find out more!

SHANGHAI CANTORI SIDEBOARD FRAME:

Shanghai Cantori sideboard has metal legs in the following finishes:

  • Category 1 - Metallized iron 1F
  • Category 2 - Patinated bronze BQ


The structure is made of wood in the following finishes:

  • Wood - Black Ash SN
  • Wood - Canaletto walnut NC
  • Wood - C7 carbon oak
  • Wood - Natural wood L5


The top (only for the 4-door version) is made in the following finishes:

  • Wood - matching the structure
  • Ceramic - Mistic Brown SV5
  • Ceramic - Calacatta SV4
  • Marble and stone 2 - Mistic Brown marble M30
  • Marble and stone 2 - MTT titanium travertine
  • Marble and stone 3 - Glossy calacatta marble MC
  • Marble and stone 3 - Matt brushed calacatta marble MC1
  • Marble and stone 3 - Elegant brown leather effect marble M10
  • Marble and stone 3 - MBC brushed black cosmic marble.


The interior of the Shanghai sideboard is available in the following finishes:

  • Land of morocco TM
  • Sepia black NS
  • New sand B5.



SHANGHAI CANTORI SIDEBOARD SIZES:

Shanghai Cantori is available in the following sizes:

  • Shanghai Cabinet - L. 100 cm x P. 52 cm x h. 160 cm
  • Shanghai Madia 4 ante - L. 240 cm x P. 52 cm x h. 83 cm.

sideboard-Shanghai-Cantori-finishes


sideboard-Shanghai-Cantori-finishes




DELIVERY TIME:

Estimated time for production and delivery of the product 7/9 working weeks from the payment received.
In this period, deliveries by manufacturing companies may be delayed.

1960.76